Boathouse Marine Center haul-out and yard work
Max LOA
Max beam
Draft / depth cited
nm to inlet (overlay)
Fuel
Liveaboard
100A
480V
Haul-out is the query. A travel-lift is not a show-week wall.
Bridge inbound may still end the program before the straps. See New River obstacles if this is a river yard.
Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.
Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.
Boathouse Marine Center transient slip 80 ft?
No. Published rack envelope is 42 ft. An 80-foot yacht is not a dry-stack product here.
Boathouse Marine Center megayacht dockage / max LOA?
Published max LOA: 42 ft. Kind: drystack.
Boathouse Marine Center annual lease / wet slip?
Not positioned as a typical annual wet-slip product.
Boathouse Marine Center to Port Everglades / fixed bridges?
About 9 nm in our planning overlay — not a NOAA distance.