Fort Lauderdale · yard

Cable Marine East

Loading marina map…
Yard work

Cable Marine East haul-out and yard work

Cable Marine East is a haul-out and yard overlay. Wet-slip hotel searches belong on ocean-basin hubs.

Max LOA

Confirm with dockmaster

Max beam

Confirm with dockmaster

Draft / depth cited

Confirm with dockmaster

nm to inlet (overlay)

1.4

Fuel

Unconfirmed

Liveaboard

Unconfirmed

100A

No

480V

No

Haul-out is the query. A travel-lift is not a show-week wall.

Bridge inbound may still end the program before the straps. See New River obstacles if this is a river yard.

Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.

Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.

Cable Marine East transient slip 80 ft?

No published LOA we will cite. Do not assume 80 ft fits. Ask the dockmaster.

Cable Marine East megayacht dockage / max LOA?

Published max LOA: Confirm with dockmaster. Kind: yard.

Cable Marine East annual lease / wet slip?

Not positioned as a typical annual wet-slip product.

Cable Marine East to Port Everglades / fixed bridges?

About 1.4 nm in our planning overlay — not a NOAA distance.