Thunderboat Marine Service Center haul-out and yard work
Max LOA
Max beam
Draft / depth cited
nm to inlet (overlay)
Fuel
Liveaboard
100A
480V
Haul-out is the query. A travel-lift is not a show-week wall.
Bridge inbound may still end the program before the straps. See New River obstacles if this is a river yard.
Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.
Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.
Thunderboat Marine Service Center transient slip 80 ft?
No published LOA we will cite. Do not assume 80 ft fits. Ask the dockmaster.
Thunderboat Marine Service Center megayacht dockage / max LOA?
Published max LOA: Confirm with dockmaster. Kind: yard.
Thunderboat Marine Service Center annual lease / wet slip?
Not positioned as a typical annual wet-slip product.
Thunderboat Marine Service Center to Port Everglades / fixed bridges?
About 3.5 nm in our planning overlay — not a NOAA distance.