Port 32 Lighthouse Point haul-out and yard work
Max LOA
Max beam
Draft / depth cited
nm to inlet (overlay)
Fuel
Liveaboard
100A
480V
Haul-out is the query. A travel-lift is not a show-week wall.
Bridge inbound may still end the program before the straps. See New River obstacles if this is a river yard.
Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.
Typical published figures and operator claims. Not a sounding, rate card, or reservation. Confirm with the dockmaster and a current chart. Not legal advice.
Port 32 Lighthouse Point transient slip 80 ft?
Published max LOA is 80 ft. Eighty feet is inside that envelope on paper. Inventory and dockmaster assignment still decide.
Port 32 Lighthouse Point megayacht dockage / max LOA?
Published max LOA: 80 ft. Kind: yard.
Port 32 Lighthouse Point annual lease / wet slip?
Not positioned as a typical annual wet-slip product.
Port 32 Lighthouse Point to Port Everglades / fixed bridges?
About 0.5 nm in our planning overlay — not a NOAA distance.