Sanlorenzo SP92

  • express
  • Performance
  • open

Overview

LOA

Beam

Draft

3 ft 11 in

Air draft

18 ft

Gallery

Sanlorenzo SP92

01 / 07

Fort Lauderdale fit

Air draft 18 ft. 17th Street closed ≈ 55 ft. SE 3rd Avenue ≈ 16 ft. Manufacturer numbers, not a survey.

FAQ

Can a Sanlorenzo SP92 clear Fort Lauderdale bridges?

Published air draft is 18 ft hardtop. 17th Street closed is about 55 ft. SE 3rd Avenue is about 16 ft. Manufacturer numbers, not a listing photo.

What draft does a Sanlorenzo SP92 need in Fort Lauderdale?

Manufacturer published draft is 3.94 ft. We keep 1 ft under-keel on the canal overlay. Victoria Park laterals are about 4.5 ft. Harbor Beach is the deep-water conversation.

Sanlorenzo SP92 LOA and beam versus canals?

91.69 ft LOA and 23.29 ft beam. Skinny isles such as Fiesta Way are limited by beam and fixed-bridge clearance.

Sources